Total Visitors April 2023 - Till Date
| S.No. | District | Agency | Scheme | Village | OHT Code | Disruption Type | Disruption Date | Expected Resolve Date | Status | Remark |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Aligarh | JMC - Lakshmi (JV) | DHATAULI WSS | Dhatauli | 20095323/01 | Electricity Connection Pending | 22-May-2024 | - | Pending | Payment was done on 22/05/2024, but the electricity connection has not been provided yet. |
| 2 | Aligarh | JMC - Lakshmi (JV) | BHARATPUR WSS | Bharatpur | 20097855/01 | Electricity Connection Pending | 22-May-2024 | - | Pending | Payment was done on 22/05/2024, but the electricity connection has not been provided yet. |
| 3 | Aligarh | PNC-SPML-JV | BAINA & RASULPUR WSS | Baina | 20088512/01 | Electricity Connection Pending | 04-Aug-2026 | 08-Oct-2026 | Pending | Connection Balance |
| 4 | Aligarh | PNC-SPML-JV | ALAHADADPUR NIVRY WSS | Alahadadpur Nivry | 20069771/01 | Electricity Connection Pending | 04-Aug-2026 | 01-Oct-2026 | Pending | Power grid connection balance |
| 5 | Baghpat | LC INFRA | Basi W/S Scheme | Basi | 20014085/01 | Electricity Connection Pending | 01-Jul-2024 | - | Resolved | Electrical connection paper pending at Gram Pradhan |
| 6 | Barabanki | Megha | KENHAURA & GULCHAMPKALA Water Supply Scheme | Gulchappa Kalan | 20094996/01 | Electricity Connection Pending | 17-Jun-2026 | - | Pending | Electricity Connection Pending |
| 7 | Etah | ION EXCHANGE | Nagla Sukhdev Gram Panchayat Re-Organization W/S Scheme | Nagla Sukhdev | ZONE01 | Electricity Connection Pending | 03-Aug-2026 | 15-Sep-2026 | Pending | Power connection estimation paid on 18/07/2026, Agreement was done on 30/07/2025, Connection still pending |
| 8 | Etah | JMC - Lakshmi (JV) | Bahadurpur kasimpur Water supply scheme | Bahadurpur Kasimpur | 20098697/01 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | Public hindrance |
| 9 | Etah | JMC - Lakshmi (JV) | Khera Gwarau Water supply scheme | Khera Gwarau | 20098703/01 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Pending | Wok not started by UPPCL |
| 10 | Etah | JMC - Lakshmi (JV) | Badhavali Gram Panchayat Water Supply Scheme | Badhawali | 20079513/01 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | work not started by UPPCL |
| 11 | Etah | JMC - Lakshmi (JV) | Loya Badshapur Water supply scheme | Loya Badshahpur Peetam Singh | 20099319/01 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | work not started by UPPCL |
| 12 | Etah | JMC - Lakshmi (JV) | Kunjalpur water supply scheme | Kunjalpur | 20100053/01 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | work not started by UPPCL |
| 13 | Etah | JMC - Lakshmi (JV) | Nagaria Urf Sikandarpur Doga water supply scheme | Nagaria Urf Sikandarpur Duga | 20100049/01 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | work not started by UPPCL |
| 14 | Etah | JMC - Lakshmi (JV) | Saidpur Water supply scheme | Saidpur | 20098701/01 | Electricity Connection Pending | 04-Aug-2026 | 20-Sep-2026 | Pending | work not started by UPPCL |
| 15 | Etah | JMC - Lakshmi (JV) | MAJHARAU GRAM PANCHAYAT WATER SUPPLY SCHEME | Majharau | 20079315/01 | Electricity Connection Pending | 04-Aug-2026 | 25-Sep-2026 | Pending | work not started by UPPCL |
| 16 | Etah | Power Mech Projects Ltd | SHITALPUR WATER SUPPLY SCHEME | Shitalpur | 20086111/01 | Electricity Connection Pending | 03-Aug-2026 | 03-Oct-2026 | Resolved | Payment has to be done. |
| 17 | Etawah | OMIL-JWIL (JV) | KISHONPUR JADONPUR | Kishonpur Jadonpur | 20099912/01 | Electricity Connection Pending | 04-Jun-2026 | 04-Sep-2026 | Resolved | Electric connection pending. |
| 18 | Farrukhabad | Vindhya-GAJA (JV) | BAGHLAKULA SVS | Baglakhula | 20097895/01 | Electricity Connection Pending | 03-Aug-2026 | - | Pending | BAGLAKHULA T/W power connection apply but estimate not received yet from Electrical Department. |
| 19 | Fatehpur | Power Mech Projects Ltd | ADAWAL RO | Adawal | 20102047/01 | Electricity Connection Pending | 15-Apr-2026 | 30-Aug-2026 | Resolved | Payment Done but Electric Connection Work Not done by Electricity Department. |
| 20 | Fatehpur | Power Mech Projects Ltd | KODAR | Kondar | 20100809/01 | Electricity Connection Pending | 15-Apr-2026 | 30-Aug-2026 | Resolved | Payment Done but Electric Connection Work Not done by Electricity Department. |
| 21 | Hathras | BGCCPL-Ramky (JV) | DHANDAULI WSS | Dhandholi | 20071579/01 | Electricity Connection Pending | 06-Feb-2026 | 03-Sep-2026 | Resolved | Dhandauli TW payment done on 06.02.2026. Connection still pending. expected issue resolve Date Given By concern Officer DVVNL in 1 Month |
| 22 | Hathras | BGCCPL-Ramky (JV) | MITANPUR WATER SUPPLY SCHEME | Bhogaon Nagla Jayas | 20087362/01 | Electricity Connection Pending | 17-Sep-2024 | 03-Sep-2026 | Resolved | Mitanpur TW payment done on 17.09.2024. Connection still pending. expected issue resolve Date Given By concern Officer DVVNL in 1 Month |
| 23 | Hathras | BGCCPL-Ramky (JV) | TIPRAS WSS | Tipras | 20060549/01 | Electricity Connection Pending | 16-Sep-2024 | 03-Sep-2026 | Pending | Tipras TW payment done on 16.09.2024. Connection still pending. expected issue resolve Date Given By concern Officer DVVNL in 1 Month |
| 24 | Hathras | BGCCPL-Ramky (JV) | KARAIYA WATER SUPPLY SCHEME | Karaiya | 20061070/01 | Electricity Connection Pending | 16-Sep-2024 | 03-Sep-2026 | Resolved | Karaiya TW payment done on 16.09.2024. Connection still pending. expected issue resolve Date Given By concern Officer DVVNL in 1 Month |
| 25 | Hathras | BGCCPL-Ramky (JV) | DHANOTI WATER SUPPLY SCHEME | Dhanothi | 20098363/01 | Electricity Connection Pending | 17-Aug-2024 | 03-Sep-2026 | Resolved | Dhanoti TW payment done on 17.08.2024. Connection still pending. expected issue resolve Date Given By concern Officer DVVNL in 1 Month |
| 26 | Hathras | BGCCPL-Ramky (JV) | TONDA WATER SUPPLY SCHEME | Tonda | 20092744/01 | Electricity Connection Pending | 14-Mar-2024 | - | Resolved | Tonda TW payment done on 14.03.2024. Connection still pending |
| 27 | Hathras | ION EXCHANGE | RASGAWAN WSS | Chamarpur | ZONE03 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | Electric estimation was paid on 6/09/2024. Connection still pending |
| 28 | Hathras | ION EXCHANGE | SHEIKHUPUR AJIT WSS | Tataarpur | ZONE04 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | Connection payment was done on 27.06.2023. Connection still pending |
| 29 | Hathras | ION EXCHANGE | RASGAWAN WSS | Kheria | ZONE04 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | Connection payment was done on 16.02.2024. Connection still pending |
| 30 | Hathras | ION EXCHANGE | SALEMPUR WSS | Madhapithu | ZONE02 | Electricity Connection Pending | 04-Aug-2026 | 15-Sep-2026 | Resolved | For Borewell No 1 connection was paid on 19.12.2023. Connection still pending |
| 31 | Hathras | ION EXCHANGE | TASINGA WSS | Tasinga | ZONE01 | Electricity Connection Pending | 04-Aug-2026 | 20-Sep-2026 | Resolved | Tasinga BW 1 payment done on 21.08.2021. Connection still pending |
| 32 | Hathras | ION EXCHANGE | TASINGA WSS | Tasinga | ZONE01 | Electricity Connection Pending | 04-Aug-2026 | 16-Sep-2026 | Resolved | Tasinga TW 2 connection payment was done on 21.08.2024. Connection still pending |
| 33 | Hathras | ION EXCHANGE | TASINGA WSS | Tasinga | ZONE01 | Electricity Connection Pending | 04-Aug-2026 | 17-Sep-2026 | Resolved | Tasinga TW 3 connection payment was done on 06.09.2024. Connection still pending |
| 34 | Jaunpur | AFCONS | AMADAHA GRAM PANCHAYAT WATER SUPPLY SCHEME | Amadaha | 20095447/01 | Electricity Connection Pending | 20-Jan-2025 | - | Pending | Payment already done on 20-01-2026 Rs4,69,250 |
| 35 | Jaunpur | AFCONS | AHAMADPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | Ahamadpur | 20086572/01 | Electricity Connection Pending | 12-Mar-2024 | - | Pending | Payment Done on dated 12.03.2024 |
| 36 | Jaunpur | AFCONS | KERAON VILLAGE WATER SUPPLY SCHEME | Keraon | 20086562/01 | Electricity Connection Pending | 01-Mar-2024 | - | Pending | Payment Already done on dated 01.03.2024 |
| 37 | Jaunpur | AFCONS | UDIASAN URF MUFTU GANJ VILLAGE WATER SUPPLY SCHEME | Udiasan Urf Mufti Ganj | 20090557/01 | Electricity Connection Pending | 01-Mar-2024 | - | Pending | UPPCL Estimate 3rd times, we have already paid 1,88,715 & 4,93,295. Again demanded 3,79,390. |
| 38 | Jaunpur | Welspun Kaveri Infraprojects JV | Chhunchha | Chhunchha | 20089683/01 | Electricity Connection Pending | 15-Mar-2023 | - | Pending | Awarded Land parcel is small, space for Solar installation is not available. Grid connection required for power supply |
| 39 | Jaunpur | Welspun Kaveri Infraprojects JV | Aunra | Aunra | 20020925/01 | Electricity Connection Pending | 23-Nov-2021 | - | Pending | Awarded Land parcel is small, space for Solar installation is not available. Grid connection required for power supply |
| 40 | Kasganj | PNC-SPML-JV | JAHANGIRPUR | Jahangirpur | 20101289/01 | Electricity Connection Pending | 04-Aug-2026 | 30-Oct-2026 | Resolved | Approach Road Not Available |
| 41 | Kushi Nagar | NCC Ltd. | GAURI SHRIRAM | Gauri Shri Ram | 20082320-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 20-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 42 | Kushi Nagar | NCC Ltd. | GANGAULI GOGP | Gangauli | 20080227-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 10-Nov-2026 | Resolved | Electricty Connection not done Yet. |
| 43 | Kushi Nagar | NCC Ltd. | AHIROULI RAJA GOGP | Ahirauli Raja | 20078933-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 44 | Kushi Nagar | NCC Ltd. | CHARGAHA | Chara Gaha | 20078970-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 45 | Kushi Nagar | NCC Ltd. | Bharsar Khas | Bharsar Khas | 20040237-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 10-Oct-2026 | Resolved | Electricity Connection Pending Yet. |
| 46 | Kushi Nagar | NCC Ltd. | BADAHARA BABU-K GOGP | Badahara | 20078366-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 10-Sep-2026 | Resolved | Electricity Connection Pending yet. |
| 47 | Kushi Nagar | NCC Ltd. | AMDARIA | Amadaria | 20073033-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 15-Sep-2026 | Resolved | Electricity conection Pending Yet |
| 48 | Kushi Nagar | NCC Ltd. | CHANDARPUR | Chandarpur | 20082193-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 10-Sep-2026 | Resolved | Electricity Connection Pending. |
| 49 | Kushi Nagar | NCC Ltd. | INDERSENWA | Ramkola | 20097181-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 11-Nov-2026 | Resolved | Electricity Connection Pending yet. |
| 50 | Kushi Nagar | NCC Ltd. | SIDHAWE | Sidhawe | 20082263-OHT1 | Electricity Connection Pending | 30-Jun-2025 | 10-Sep-2026 | Resolved | Electricity Connection Pending Yet. |
| 51 | Kushi Nagar | NCC Ltd. | RAMPUR BAGAHA | Rampur Bagaha | 20082305-OHT1 | Electricity Connection Pending | 03-Jun-2025 | 15-Sep-2026 | Resolved | Electricty Connection not done Yet. |
| 52 | Kushi Nagar | NCC Ltd. | AWARAHI KRITPURA | Awarahi Kritpura | 20082087-OHT1 | Electricity Connection Pending | 03-Jun-2025 | 10-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 53 | Kushi Nagar | NCC Ltd. | MORWAN | Morwan | 20073407-OHT1 | Electricity Connection Pending | 03-Jun-2025 | 15-Oct-2026 | Resolved | Electricaity Connection Pending yet. |
| 54 | Kushi Nagar | NCC Ltd. | BINDUAR | Binduar | 20081809-OHT1 | Electricity Connection Pending | 03-Jun-2025 | 15-Sep-2026 | Resolved | Electricity connection Pending yet. |
| 55 | Kushi Nagar | NCC Ltd. | SAURAHA BUZURG | Saurha Buzurg | 20073432-OHT1 | Electricity Connection Pending | 03-Jun-2025 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 56 | Kushi Nagar | NCC Ltd. | POKHAR BHINDA | Pokhar Bhinda | 20101611-OHT1 | Electricity Connection Pending | 16-Dec-2024 | 10-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 57 | Kushi Nagar | NCC Ltd. | NAKATAHA BASDILA | Nakataha Basdila | 20097035-OHT1 | Electricity Connection Pending | 04-Oct-2024 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 58 | Kushi Nagar | NCC Ltd. | AHIRAULI | Ahiraule | 20106859-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 59 | Kushi Nagar | NCC Ltd. | GAURI SHUKUL | Gauri Sukul | 20102417-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 20-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 60 | Kushi Nagar | NCC Ltd. | KHAIRATIYA | Jalal Chhapra | 20106713-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 30-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 61 | Kushi Nagar | NCC Ltd. | MALHO | Tulsi Patti | 8388204-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 20-Nov-2026 | Pending | Electricty Connection not done Yet. |
| 62 | Kushi Nagar | NCC Ltd. | PATHARWA | Patharwa | 20042728-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 20-Oct-2026 | Pending | Electricty Connection not done Yet. |
| 63 | Kushi Nagar | NCC Ltd. | RAKBAJUNGLI PATTI R | Rakbajunglli Patti | 20098913-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 64 | Kushi Nagar | NCC Ltd. | PARASAUNI BUZURG RO | Parasauni Buzurg | 20098932-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 15-Oct-2026 | Pending | Electricty Connection not done Yet. |
| 65 | Kushi Nagar | NCC Ltd. | GANESH PATTI | Ganesh Patti | 20102413-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 20-Oct-2026 | Pending | Electricty Connection not done Yet. |
| 66 | Kushi Nagar | NCC Ltd. | BHIURA | BHIURA | 20106858-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 16-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 67 | Kushi Nagar | NCC Ltd. | KATAURA | Kataura | 20101609-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 10-Nov-2026 | Resolved | Electricity connection not done yet. |
| 68 | Kushi Nagar | NCC Ltd. | MATHIA MAFI RO | Mathiamafi Urf Dukhi Ganeshpur | 20102430-OHT1 | Electricity Connection Pending | 04-Jun-2024 | 20-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 69 | Kushi Nagar | NCC Ltd. | PATERHA | Paterha | 20102431-OHT1 | Electricity Connection Pending | 06-Apr-2024 | 10-Sep-2026 | Resolved | Electricity connection pending yet |
| 70 | Kushi Nagar | NCC Ltd. | PIPRAGHAT | Pipraghat Ahatmali | 20097042-OHT1 | Electricity Connection Pending | 02-Mar-2024 | 15-Oct-2026 | Pending | Electricty Connection not done Yet. |
| 71 | Kushi Nagar | NCC Ltd. | PAKRI BRIJLAL | Pakari Brijlal No.2 | 8386824-OHT1 | Electricity Connection Pending | 20-Feb-2024 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 72 | Kushi Nagar | NCC Ltd. | SISWA GOPAL | Siswa Gopal | 20050914-OHT1 | Electricity Connection Pending | 20-Feb-2024 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 73 | Kushi Nagar | NCC Ltd. | BRINDABAN | Brindaban | 20040280-OHT1 | Electricity Connection Pending | 20-Feb-2024 | 15-Sep-2026 | Resolved | Electrical Connection Pending |
| 74 | Kushi Nagar | NCC Ltd. | GANGRAI | Gangrai | 20102428-OHT1 | Electricity Connection Pending | 20-Feb-2024 | 15-Sep-2026 | Resolved | Electricty Connection not done Yet. |
| 75 | Kushi Nagar | NCC Ltd. | VIJAIPUR | Vijaipur | 20051261-OHT1 | Electricity Connection Pending | 20-Feb-2024 | 10-Oct-2026 | Resolved | electricity connection pending yet. |
| 76 | Kushi Nagar | NCC Ltd. | KUCHAYA RO | KUCHAYA | 20098937-OHT1 | Electricity Connection Pending | 16-Feb-2024 | 10-Sep-2026 | Resolved | Electricty Connection not done Yet. |
| 77 | Kushi Nagar | NCC Ltd. | RAHASUJANUBI PATTI R | Rahasujanubi Patti | 20098931-OHT1 | Electricity Connection Pending | 16-Feb-2024 | 15-Sep-2026 | Resolved | Electricty Connection not done Yet. |
| 78 | Kushi Nagar | NCC Ltd. | PADRI MEHDIA | Padri Mehdia | 20101619-OHT1 | Electricity Connection Pending | 16-Feb-2024 | 25-Sep-2026 | Resolved | Electricty Connection not done Yet. |
| 79 | Kushi Nagar | NCC Ltd. | KURMAUL Urf SOHANPUR | Kurmaul Urf Sohanpur | 20098904-OHT1 | Electricity Connection Pending | 16-Feb-2024 | 15-Oct-2026 | Pending | Electricty Connection not done Yet. |
| 80 | Kushi Nagar | NCC Ltd. | CHAKIA SOBHMAL | Chakia | 8388387-OHT1 | Electricity Connection Pending | 03-Feb-2024 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 81 | Kushi Nagar | NCC Ltd. | PARSADPUR | Parsadpur | 20101605-OHT1 | Electricity Connection Pending | 03-Feb-2024 | 10-Nov-2026 | Resolved | Electricty Connection not done Yet. |
| 82 | Kushi Nagar | NCC Ltd. | PARSA URF SIRSIA | Parsa Ahatmali | 20042706-OHT1 | Electricity Connection Pending | 03-Feb-2024 | 15-Oct-2026 | Pending | Electricty Connection not done Yet. |
| 83 | Kushi Nagar | NCC Ltd. | BIRWAT KOMWALIA R | Birwat Komwalia | 20098928-OHT1 | Electricity Connection Pending | 03-Feb-2024 | 15-Oct-2026 | Resolved | Electricty Connection not done Yet. |
| 84 | Lucknow | NCC Ltd. | Narendi Water Supply Scheme | Narendi | 20070143/01 | Electricity Connection Pending | 25-Mar-2026 | - | Resolved | Due to Non Providing of Estimate, we are unable to supply the water to villages |
| 85 | Lucknow | NCC Ltd. | Dedhari, Rampur Garhi Jamuni & Bramhdas Pur | Bramhedas Pur | 20070391/01 | Electricity Connection Pending | 20-Mar-2026 | - | Resolved | Due to Non Providing of Electricity power, we are unable to supply the water to villages |
| 86 | Lucknow | NCC Ltd. | Lonha | Lonha | 8360588/01 | Electricity Connection Pending | 06-Mar-2026 | - | Resolved | Due to Non Providing of Estimate, we are unable to supply the water to villages |
| 87 | Lucknow | NCC Ltd. | Papnamau | Papnamau | 20015648/01 | Electricity Connection Pending | 03-Mar-2026 | - | Resolved | Due to Non Providing of Estimate, we are unable to supply the water to villages |
| 88 | Lucknow | NCC Ltd. | Bhadeshwa & Dhanuwa Sand | Bhadeshwa | 20070387/01 | Electricity Connection Pending | 13-Feb-2026 | - | Resolved | Due to Non Providing of Electricity power, we are unable to supply the water to villages. |
| 89 | Lucknow | NCC Ltd. | Pahiaajampur | Pahiaajampur | 20070064/01 | Electricity Connection Pending | 07-Feb-2026 | - | Resolved | Due to Non Providing of Estimate, we are unable to supply the water to villages |
| 90 | Muzaffarnagar | JMC - Lakshmi (JV) | HARENTI SALEMPUR | Harenti | 20062927/01 | Electricity Connection Pending | 04-Aug-2026 | - | Pending | The villagers are opposing of the electric line |
| 91 | Muzaffarnagar | JMC - Lakshmi (JV) | GHISUKHERA | Ghisukhera | 20039787/01 | Electricity Connection Pending | 04-Aug-2026 | - | Pending | The villagers are opposing of the electric line |
| 92 | Pilibhit | VISHVARAJ | PIPARI AGROO GP WATER SUPPLY SCHEME | Pipria Agru | 20096590/01 | Electricity Connection Pending | 14-Jan-2026 | - | Pending | Estimate amount paid to the UPPCL but, electrical connection is still pending, which is hampering the regular water supply. |
| 93 | Pilibhit | VISHVARAJ | SIRSA GP WATER SUPPLY SCHEME | Sirsa | 20051046/01 | Electricity Connection Pending | 14-Jan-2026 | - | Pending | Estimate amount paid to UPPCL, but electrical connection is still pending. |
| 94 | Pilibhit | VISHVARAJ | Parsadpur+1 Multi GP water supply scheme | Parsadpur | 20096350/01 | Electricity Connection Pending | 05-Oct-2024 | - | Pending | Estimate amount paid to UPPCL, but electrical connection is still pending. |
| 95 | Pilibhit | VISHVARAJ | khamaria pandari water supply scheme | Khamaria Pandri | 20096325/01 | Electricity Connection Pending | 05-Oct-2024 | - | Pending | Estimate amount paid to UPPCL, but electrical connection is still pending. |
| 96 | Rampur | SPML Infra | BALPURA VILL W/S SCHEME | Balpura | 20096263 | Electricity Connection Pending | 04-Aug-2026 | - | Resolved | Pending after TC amount deposited to UPPCL |
| 97 | Sant Ravidas Nagar | Welspun Kaveri Infraprojects JV | Poore Vishvanath Multi GP Water Supply Scheme | Harihar Pursoni | 20024596/01 | Electricity Connection Pending | 25-Nov-2021 | 30-Aug-2026 | Pending | HT Line shifting pending for commencement of construction activities |