| S.No. | District | Agency | Scheme | Village | OHT Code | Disruption Type | Disruption Date | Expected Resolve Date | Status | Remark |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Baghpat | LC INFRA | Subhanpur W/S SCHEME | Subhanpur | 20093570/01 | Public Hindrance / Local Hindrance | 16-Nov-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 2 | Baghpat | LC INFRA | GORIPUR JAWAHARNAGAR | GORIPUR JAWAHAR NAGAR | 8361859/01 | Public Hindrance / Local Hindrance | 03-Nov-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 3 | Baghpat | LC INFRA | ahera w/s scheme | AHERA | 20085475/01 | Public Hindrance / Local Hindrance | 15-Oct-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 4 | Baghpat | LC INFRA | Biharipur W/S SCHEME | BIHARIPUR | 20093495/01 | Public Hindrance / Local Hindrance | 23-Sep-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 5 | Baghpat | LC INFRA | Mansoorpur W/S SCHEME | Mansoorpur | 20093619/01 | Public Hindrance / Local Hindrance | 16-Sep-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 6 | Baghpat | LC INFRA | Ramala W/S Scheme | Ramala | 20014308/01 | Public Hindrance / Local Hindrance | 11-Aug-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 7 | Baghpat | LC INFRA | Rasoolpur Sankal Poothi wss | Rasoolpur Sankal Poothi | 20060291/01 | Public Hindrance / Local Hindrance | 01-Aug-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 8 | Baghpat | LC INFRA | Barwala W/S SCHEME | Barwala | 20077050/01 | Public Hindrance / Local Hindrance | 15-Jul-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 9 | Baghpat | LC INFRA | Khaila W/S SCHEME | Khaila | 20093509/01 | Public Hindrance / Local Hindrance | 15-Jul-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 10 | Baghpat | LC INFRA | Nibali W/S SCHEME | NIWALI | 20023770/01 | Public Hindrance / Local Hindrance | 10-Jul-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 11 | Baghpat | LC INFRA | NIWARA W/S SCHEME | NIWARA | 20080099/01 | Public Hindrance / Local Hindrance | 25-Jun-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 12 | Baghpat | LC INFRA | GUANA | Gauna | 8362518/01 | Public Hindrance / Local Hindrance | 20-Jun-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 13 | Baghpat | LC INFRA | Fakhapur Mohammad Shahpur W/S SCHEME | Fakharpur Mohammad Shahpur | 20080085/01 | Public Hindrance / Local Hindrance | 21-May-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 14 | Baghpat | LC INFRA | Sanjarpur Kaidwa | Sanjarpur Kaidwa | 20023772/01 | Public Hindrance / Local Hindrance | 13-May-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 15 | Baghpat | LC INFRA | Norozpur Aima W/S Scheme | Norozpur Aima | 20097145/01 | Public Hindrance / Local Hindrance | 21-Apr-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 16 | Baghpat | LC INFRA | Tanda W/S Scheme | Tanda | 20014289/01 | Public Hindrance / Local Hindrance | 26-Mar-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 17 | Baghpat | LC INFRA | Kheda Islampur W/S SCHEME | KHERAE ISLAMPUR | 20014194/01 | Public Hindrance / Local Hindrance | 13-Feb-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 18 | Baghpat | LC INFRA | sadakpur jonmana w/s scheme | Sadakpur Jonmana | 20014251/01 | Public Hindrance / Local Hindrance | 10-Feb-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 19 | Baghpat | LC INFRA | Rajpur Khampur | RAJPUR KHAMPUR | 20016331/01 | Public Hindrance / Local Hindrance | 23-Jan-2025 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 20 | Baghpat | LC INFRA | Dhanaura Silvernagar W/S Scheme | DHANAURA SILVERNAGAR | 20014606/01 | Public Hindrance / Local Hindrance | 26-Dec-2024 | - | Resolved | Local issues of land dispute is there, Therefore, additional time is required to resolve the issue and complete the scheme. |
| 21 | Barabanki | Megha | Sukhipur Water Supply Scheme | Sukhipur | 20068871/01 | Public Hindrance / Local Hindrance | 20-Aug-2025 | - | Resolved | Local people |
| 22 | Barabanki | Megha | Twndwa Water Supply Scheme | Tendwa | 20057467/01 | Public Hindrance / Local Hindrance | 13-Jun-2025 | - | Resolved | Local People |
| 23 | Etawah | Indian Hume Pipe | Ayara Luhia PWS | Ayara Luhia | 20024538/01 | Public Hindrance / Local Hindrance | 04-Aug-2026 | - | Resolved | Baundary wall construction not completed due to public hindrance. |
| 24 | Etawah | Indian Hume Pipe | Pilkhar PWS | Pilkhar | 20022489/01 | Public Hindrance / Local Hindrance | 04-Aug-2026 | - | Resolved | Baundary wall construction not completed due to public hindrance. |
| 25 | Farrukhabad | Vindhya-GAJA (JV) | BHATPURA SVS | Bhatpura | 20076798/01 | Public Hindrance / Local Hindrance | 03-Aug-2026 | - | Resolved | Main pipeline laying and jointing work pending due to local public not allowing for PWD and Gram panchyat road trench cutting. |
| 26 | Ghaziabad | LC INFRA | KUNHAIDA PIPE WATER SUPPLY SCHEME | Kunhaida | 20093533/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Sep-2026 | Resolved | campus hindrance |
| 27 | Ghaziabad | LC INFRA | SHARIFABAD RAJAPUR | Sharifabad Rajapur | GZB-10 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Sep-2026 | Resolved | Local issues of land disputes is there |
| 28 | Ghaziabad | LC INFRA | MAHMOODPUR | Mahmoodpur | GZB-16 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Aug-2026 | Resolved | Local issues of land disputes is there |
| 29 | Ghaziabad | LC INFRA | KAJAMPUR PWS SCHEME | Kajampur | GZB-34 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Sep-2026 | Resolved | Local issues of land disputes is there |
| 30 | Ghaziabad | LC INFRA | DINANATHPUR POOTHI PWS SCHEME | DINANATHPUR PUTHI | 20021483/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 31-Aug-2026 | Resolved | Local issues of land disputes is there |
| 31 | Ghaziabad | LC INFRA | SADAT NAGAR IKLA PWS SCHEME | Sadat Nagar Ikla | 20022910/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 31-Aug-2026 | Resolved | Local issues of land disputes is there |
| 32 | Ghaziabad | LC INFRA | SIRORA SALEMPUR PWS SCHEME | Sirora Salempur | 20023594/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Sep-2026 | Resolved | Local issues of land disputes is there |
| 33 | Ghaziabad | LC INFRA | NAGLA FIROZ MOHANPUR PWS SCHEME | Nagla Firoj Mohanpur | 20023620/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Sep-2026 | Resolved | Local issues of land disputes is there |
| 34 | Ghaziabad | LC INFRA | FATIYABAD NIHAURA PWS SCHEME | Fatiyabad Nitora | GZB-08 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 31-Aug-2026 | Resolved | Local issues of land disputes is there |
| 35 | Ghaziabad | LC INFRA | KILHAUDA PWS SCHEME | Kilhauda | GZB-09 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 31-Aug-2026 | Resolved | Local issues of land disputes is there |
| 36 | Ghaziabad | LC INFRA | SIKRIKHURD PWS SCHEME | Sikri Khurd | GZB-27 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Sep-2026 | Resolved | Local issues of land disputes is there |
| 37 | Ghaziabad | LC INFRA | PANCHAYARA PWS SCHEME | Panchayara | GZB-28 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 29-Sep-2026 | Resolved | Local issues of land disputes is there |
| 38 | Ghaziabad | LC INFRA | NANU PWS SCHEME | Nanu | 20026204/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 31-Aug-2026 | Resolved | Local issues of land disputes is there |
| 39 | Ghaziabad | LC INFRA | BADSHAHPUR SIROLI PWS SCHEME | Badshahpur Sirouli | 20026223/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Sep-2026 | Resolved | Local issues of land disputes is there |
| 40 | Ghaziabad | LC INFRA | BARKA ARIFPUR PWS SCHEME | Badka Arifpur | 20026225/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 31-Aug-2026 | Resolved | BARKA ARIFPUR PWS SCHEME |
| 41 | Ghaziabad | LC INFRA | AFJALPUR PWS SCHEME | Afzalpur | 20026568/01 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Nov-2026 | Resolved | Local issues of land disputes is there |
| 42 | Hathras | BGCCPL-Ramky (JV) | DAUDA BANKA WATER SUPPLY SCHEME | DAUDA | 20098369/01 | Public Hindrance / Local Hindrance | 16-Sep-2024 | - | Resolved | electric Connection still Pending |
| 43 | Jaunpur | Welspun Kaveri Infraprojects JV | Kuchhmuchh Scheme-2 | Kuchhmuchh | 20089696/01 | Public Hindrance / Local Hindrance | 15-Mar-2023 | - | Resolved | Work Hampered due to Local Hindrance for laying the Pipeline network |
| 44 | Jaunpur | Welspun Kaveri Infraprojects JV | DEORAM PUR | Deoram Pur | 20064889/01 | Public Hindrance / Local Hindrance | 27-Jan-2023 | - | Resolved | Boundary wall Construction Work Hampered due to local public hindrance. (Reorganisation Scheme) |
| 45 | Jaunpur | Welspun Kaveri Infraprojects JV | Badouli Ahiran | Badouli Ahiran | 20067727/01 | Public Hindrance / Local Hindrance | 27-Jan-2023 | - | Resolved | Work Hampered due to Local Hindrance for laying the Pipeline network |
| 46 | Kushi Nagar | NCC Ltd. | SIKTA GOGP | Pipraicha | 20078358-OHT1 | Public Hindrance / Local Hindrance | 04-Jul-2024 | 20-Oct-2026 | Resolved | 3500 Mtr GOGP Issue by Local villagers.Not allowing to work in this Revenue Village. |
| 47 | Kushi Nagar | NCC Ltd. | Rampur Gonha | Rampur Gonha | 20050005-OHT1 | Public Hindrance / Local Hindrance | 15-Jun-2024 | 25-Nov-2026 | Resolved | Parlallel along Railway Line & Pradhan Issue.2360 Mtr Pipe Laying affected. |
| 48 | Kushi Nagar | NCC Ltd. | SARISWA | Khiriya | 20078851-OHT1 | Public Hindrance / Local Hindrance | 10-Jun-2024 | 10-Oct-2026 | Resolved | Due to GOGP Issue 7000 mtr Pipe laying work stopped by Local Villagers. |
| 49 | Kushi Nagar | NCC Ltd. | SOHASAPATTI GOUSI GOGP | Sohsa Patti Gausi | 20078357-OHT1 | Public Hindrance / Local Hindrance | 04-Jun-2024 | 20-Oct-2026 | Resolved | Gram pradhan row by Local Hindrance 1920 Mtr |
| 50 | Kushi Nagar | NCC Ltd. | SINGAHA | Sigha | 20101604-OHT1 | Public Hindrance / Local Hindrance | 04-Jun-2024 | 20-Nov-2026 | Resolved | Loacal Hindarance Pipe laying 4104 Mtr .Pipe line laying stop by local villagers. |
| 51 | Kushi Nagar | NCC Ltd. | BARWA RATANPURA RO | Barwa Ratanpur | 20098935-OHT1 | Public Hindrance / Local Hindrance | 04-Jun-2024 | 15-Oct-2026 | Resolved | Local Hindarance up to 3400 Mtr by Local Villagers. |
| 52 | Kushi Nagar | NCC Ltd. | MITHHA MAFI | MITHHA MAFI | 20042197-OHT1 | Public Hindrance / Local Hindrance | 04-Jun-2024 | 25-Sep-2026 | Resolved | GOGP Issue approx 4030 Mtr .Villagers not allowing Pipe laying Work. |
| 53 | Kushi Nagar | NCC Ltd. | MAHUA DIH LAUNGRAPUR GOGP | Baidauli Mahua Dih | 20078331-OHT1 | Public Hindrance / Local Hindrance | 04-Apr-2024 | 20-Oct-2026 | Resolved | GOGP Issue of 10147 Mtr.Pipe laying not done due GOGP Issue by Local Villagers |
| 54 | Kushi Nagar | NCC Ltd. | LALIPAR GOGP | Chhitauni | 20078318-OHT1 | Public Hindrance / Local Hindrance | 10-Feb-2024 | 15-Oct-2026 | Resolved | Local Hindarnce by 1660 Mtr .Pipe |
| 55 | Kushi Nagar | NCC Ltd. | MAHUI KHURD | Bharwalia | 20081810-OHT1 | Public Hindrance / Local Hindrance | 05-Feb-2024 | 20-Nov-2026 | Resolved | GOGP Issue of 4840 Mtr by Local Villagers. |
| 56 | Kushi Nagar | NCC Ltd. | NATWALIYA GOGP | Chirgoda | 20076106-OHT1 | Public Hindrance / Local Hindrance | 04-Feb-2024 | 15-Oct-2026 | Resolved | GOGP Issue of 7209 Mtr by Local Villagers. |
| 57 | Kushi Nagar | NCC Ltd. | KHOTAHI | Khotahi | 20101616-OHT1 | Public Hindrance / Local Hindrance | 04-Feb-2024 | 15-Oct-2026 | Resolved | Local Hinadance 4100 mtr by Villager Stop work. |
| 58 | Kushi Nagar | NCC Ltd. | PIPRAGHAT MUSTKIL R | Pipraghat Mustkil | 20098907/01 | Public Hindrance / Local Hindrance | 04-Feb-2024 | 25-Sep-2026 | Resolved | Gram Pradhan issue by 2000 mtr Pipe laying work stopped. |
| 59 | Kushi Nagar | NCC Ltd. | SANERAMAL CHHAPARA | Pakari Bangar | 20081552-OHT1 | Public Hindrance / Local Hindrance | 04-Feb-2024 | 15-Sep-2026 | Resolved | GOGP issue by Local Villagers approx 5000 Mtr Row by Local Villagers. |
| 60 | Kushi Nagar | NCC Ltd. | PAREWATER GOGP | Bhathahi Raja | 20078353-OHT1 | Public Hindrance / Local Hindrance | 04-Feb-2024 | 10-Oct-2026 | Resolved | GOGP issue by Local Villagers approx 3050 Mtr Pipe laying work stopped by Villagers. |
| 61 | Kushi Nagar | NCC Ltd. | Baghparna | Motipur | 20039737-OHT1 | Public Hindrance / Local Hindrance | 04-Jan-2024 | 20-Sep-2026 | Resolved | GOGP issue by Local Villagers approx 3010 mtr Pipe laying work stopped by villgers |
| 62 | Kushi Nagar | NCC Ltd. | JOGIA SHAMLI PATTI GROUP OF G.P.s | Jogia Hichharai | 20077419-OHT1 | Public Hindrance / Local Hindrance | 04-Jul-2023 | 20-Oct-2026 | Resolved | GOGP Issue in Jogia Hichharai .Pipe laying 7890 Mtr work stopped . |
| 63 | Kushi Nagar | NCC Ltd. | HARAIYA BUZURG | Kohra | 20079384-OHT1 | Public Hindrance / Local Hindrance | 04-Jun-2023 | 15-Sep-2026 | Resolved | GOGP Issue by Villagers approx 4000 Mtr Pipe laying work Stopped by Villagers |
| 64 | Pilibhit | PNC-SPML-JV | PARASI URF PARASIA VILLAGE WATER SUPPLY SCHEME | Parasi Urf Parasia | 20013902/01 | Public Hindrance / Local Hindrance | 05-Aug-2025 | - | Resolved | local people creating issue on pipelaying |
| 65 | Pilibhit | PNC-SPML-JV | NIZAM DANDI VILLAGE WATER SUPPLY SCHEME | Nizam Dandi | 20013743/01 | Public Hindrance / Local Hindrance | 05-Aug-2025 | - | Resolved | Local People issue for approach road to over head tank campus. |
| 66 | Pilibhit | PNC-SPML-JV | ARJUNPUR MUSTQIL | Arjunpur Must. | 8389916/01 | Public Hindrance / Local Hindrance | 05-Aug-2025 | - | Resolved | Local people oppose in Laying of Pipe. |
| 67 | Pilibhit | PNC-SPML-JV | SONDHA & BAGAR VILLAGE WATER SUPPLY SCHEME | Bangar | 20013635/01 | Public Hindrance / Local Hindrance | 05-Aug-2024 | - | Resolved | Local people do not agree to pipe laying. |
| 68 | Pilibhit | PNC-SPML-JV | NARAYANPUR VILLAGE WATER SUPPLY SCHEME | Narayanpur | 20013668/01 | Public Hindrance / Local Hindrance | 05-Aug-2024 | - | Resolved | Local people oppossing for Pipelaying. |
| 69 | Pilibhit | PNC-SPML-JV | RAMPURA NATTHU VILLAGE WATER SUPPLY SCHEME | Rampura Natthu | 20013755/01 | Public Hindrance / Local Hindrance | 05-Aug-2024 | - | Resolved | Local People oppossing for pipelaying. |
| 70 | Pilibhit | PNC-SPML-JV | HARDASPUR VILLAGE WATER SUPPLY SCHEME | Hardaspur | 20013570/01 | Public Hindrance / Local Hindrance | 04-May-2023 | - | Resolved | Local people oppose to lay the pipe in village. |
| 71 | Pilibhit | VISHVARAJ | BHINDARA GP WATER SUPPLY SCHEME | Bhindara | 20057519/01 | Public Hindrance / Local Hindrance | 20-Dec-2024 | - | Resolved | The Chairman of the Nagar Panchayat has denied permission for the NH crossing jointing from the laid pipeline. |
| 72 | Pilibhit | VISHVARAJ | BAIBAHA +3 MULTI GP WATER SUPPLY SCHEME | Baibaha | 20059990/01 | Public Hindrance / Local Hindrance | 25-Aug-2024 | - | Resolved | Sikh community is resisting dismantling-restoration and laying of pipeline work. |
| 73 | Pilibhit | VISHVARAJ | BITHAURA KALAN GRAM PANCHAYAT WATER SUPPLY SCHEME | Bithaura Kalan | 20060822/01 | Public Hindrance / Local Hindrance | 14-Jun-2024 | - | Resolved | Gram pradhan is resisting the dismantling -restoration and pipeline laying work. |
| 74 | Pilibhit | VISHVARAJ | LALPURIA SAHEB SINGH+ 1 MULTI GP WATER SUPPLY SCHEME | Lalpuria Saheb Singh | 20096313/01 | Public Hindrance / Local Hindrance | 14-Jun-2024 | - | Resolved | Residents of Tirumala Colony have denied permission for dismantling- restoration and pipeline laying work. |
| 75 | Pilibhit | VISHVARAJ | BAREHPURA MARURI + 2 mULTI GP wATER SUPPLY SCHEME | Barhepura Marauri | 20061462/01 | Public Hindrance / Local Hindrance | 14-Jun-2024 | - | Resolved | The Gram Pradhan is resisting CC dismantling - restoration and Pipelaying work. |
| 76 | Pilibhit | VISHVARAJ | NAGRA RATA +1MGP Water Supply Scheme | Nagra Rata | 20067099/01 | Public Hindrance / Local Hindrance | 14-Jun-2024 | - | Resolved | Villagers are resisting CC dismantling- restoration and pipeline laying works. |
| 77 | Pilibhit | VISHVARAJ | Udara +1 GRAM PANCHAYAT WATER SUPPLY SCHEME | Udara | 20060888/01 | Public Hindrance / Local Hindrance | 14-May-2024 | - | Resolved | Pipeline laying is affected due to resistance from the Sikh community. |
| 78 | Pilibhit | VISHVARAJ | ROOPPUR KRIPA GP WATER SUPPLY SCHEME | Roop Pur Kripa | 20096347/01 | Public Hindrance / Local Hindrance | 17-Apr-2024 | - | Resolved | Gram pradhan is denying the cc restoration and jointing work, which is hampering water supply. |
| 79 | Pilibhit | VISHVARAJ | CHURRA SAKATPUR + 1 MULTI GRAM PANCHAYAT WATER SUPPLY SCHEME | Churra Sakatpur | 20060529/01 | Public Hindrance / Local Hindrance | 14-Mar-2024 | - | Resolved | The Gram Pradhan is resisting in dismantling-restoration and pipelaying work. |
| 80 | Pilibhit | VISHVARAJ | PAREWA TA KISHANI +1 MULTI GP WATER SUPPLY SCHEME | Parewa T. Kishni | 20060702/01 | Public Hindrance / Local Hindrance | 14-Mar-2024 | - | Resolved | The Gram Pradhan is resisting in dismantling -restoration & pipeline laying work. |
| 81 | Pilibhit | VISHVARAJ | TANDA BIJAISI SAHRAI GRAM PANCHAYAT WATER SUPPLY SCHEME | Tanda Bijaisi Sahrai | 20060909/01 | Public Hindrance / Local Hindrance | 14-Mar-2024 | - | Resolved | Pipeline laying and household connections are affected due to resistance from the Sikh community. Railway authorities have also denied permission for pipeline laying along the railway line. |
| 82 | Pilibhit | VISHVARAJ | KADHER CHAURA T.GAJRAULA GP WATER SUPPLY SCHEME | KADHER CHAURA T. GAJRAULA | 20060431/01 | Public Hindrance / Local Hindrance | 14-Mar-2024 | - | Resolved | Pipelaying works remains pending due to resistance from the Sikh community. |
| 83 | Pilibhit | VISHVARAJ | BILHARI GRAM PANCHAYAT WATER SUPPLY SCHEME | Gadyana | 20051048/01 | Public Hindrance / Local Hindrance | 22-Oct-2023 | - | Resolved | Pipeline in RV Gadiyana remains pending due to resistance from the Sikh community. |
| 84 | Pilibhit | VISHVARAJ | BHARATPUR GRAM PANCHAYAT WATER SUPPLY SCHEME | Bharatpur | 20060918/01 | Public Hindrance / Local Hindrance | 14-Aug-2023 | - | Resolved | Pipeline laying of approximately 5 km is pending due to resistance from the Sikh community. |
| 85 | Pilibhit | VISHVARAJ | KANPARI +1 MULTI GP WATER SUPPLY SCHEME | Kanpari | 20053324/01 | Public Hindrance / Local Hindrance | 20-Apr-2023 | - | Resolved | The Gram Pradhan is resisting dismantling -restoration and pipeline laying. |
| 86 | Saharanpur | NKG-PRIMUS (JV) | GHALAULI MV WSS | Ghalauli | 20072573/01 | Public Hindrance / Local Hindrance | 10-Sep-2026 | - | Resolved | local hindrance |
| 87 | Sant Kabeer Nagar | JAKSON | Kasauna Khurd GP WSS | KASAUNA KHURD | 20084486/01 | Public Hindrance / Local Hindrance | 03-Jun-2023 | - | Resolved | yahan kafi lambe samay se alloted land par local public ka hinrance hai, kyonki ye SVS hai to yahan kary complete karne ka samay bhi bahut kam hai |
| 88 | Sant Kabeer Nagar | VISHVARAJ | BANTWAR & BELMA GOV WATER SUPPLY SCHEME | Bantwar | 20094318 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Nov-2026 | Resolved | The residents of Belma village are demanding a separate overhead water tank, due to which they are obstructing the pipeline laying and household connection works. |
| 89 | Sant Kabeer Nagar | VISHVARAJ | RAJNAULI & SANTHI GP WSS | Rajnauli | 20086765 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Nov-2026 | Resolved | The residents of Rajnauli village are demanding a separate overhead water tank, resulting in resistance to the pipeline laying and household connection works. |
| 90 | Sant Kabeer Nagar | VISHVARAJ | DARUA JAPTI ADALAT & SHIVAPAR GOV WSS | Darua Japti Adalat | 20086124 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Nov-2026 | Resolved | No approach road is available to the government land for construction activities. The tube well has been constructed; however, the remaining works could not be carried out without obstruction due to the absence of an approach road. |
| 91 | Sant Kabeer Nagar | VISHVARAJ | Sehura & Koelsa GOV WSS | Sehura | 20086908 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Nov-2026 | Resolved | No approach road is available to the government land. Consequently, the construction work cannot be executed smoothly due to the absence of an approach road. |
| 92 | Sant Kabeer Nagar | VISHVARAJ | CHAGERA MANGERA GP WSS | Chagera Mangera | 20085382 | Public Hindrance / Local Hindrance | 05-Aug-2026 | 30-Nov-2026 | Resolved | The pipeline from Tube Well-2 to the Overhead Tank (OHT) campus could not be laid due to issues related to the availability of an approach route. |