| 1 |
20015168 |
PARSPUR SCHEME |
20015168/01 |
Ghazipur |
Jakhania |
Parspur |
471555 |
Parspur |
Road Widening |
18-Mar-2026 |
|
The scheme was under operation and maintenance (O&M), and regular water supply was functioning smoothly up to 17-03-2026. However, on 18-03-2026, the HDPE pipeline of 63 mm diameter (78 Rmt) and 110 mm diameter (48 Rmt) was damaged by the PWD department during road construction work.As a result, 35 Nos. of FHTCs were damaged, along with 96 Rmt of MDPE pipeline. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road because of the damaged pipelines. |
| 2 |
8361347 |
NURPUR MUBARAKPUR GRAM PANCHAYAT WATER SUPPLY SCHEME |
8361347/01 |
Ghazipur |
Ghazipur |
Nurpur Mubarakpur |
472786 |
Chak Khodaia |
Road Widening |
25-Mar-2026 |
|
The scheme was under O&M, and regular water supply was functioning smoothly up to 24-03-2026. However, on 25-03-2026, the HDPE pipeline of 90 mm diameter (10 Rmt) was damaged by JCB during shifting of electrical pole by person Raj dev Yadav. As a result, 51 Nos. of FHTCs were damaged. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road due to the damaged pipelines. |
| 3 |
20100572 |
BARAI PARA W/S SCHEME |
20100572/01 |
Ghazipur |
Manihari |
Barai Para |
471745 |
Barai Para |
Road Widening |
19-Mar-2026 |
|
The scheme was under trial run phase, and regular water supply was functioning smoothly up to 18-03-2026. However, on 19-03-2026, the HDPE pipeline of 63 mm diameter (368 Rmt) was damaged by the PWD department during drainage construction work on both sides of the road. As a result, 56 Nos. of FHTCs were damaged, along with 215 Rmt of MDPE pipeline. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road due to the damaged pipelines. |