| 1 |
20015168 |
PARSPUR SCHEME |
20015168/01 |
Ghazipur |
Jakhania |
Parspur |
471555 |
Parspur |
Road Widening |
11-Feb-2026 |
|
At the time of road widening by PWD department HDPE pipeline damaged of dia 63mm - 50 Mtr and dia 110mm - 60 Mtr. |
| 2 |
20015168 |
PARSPUR SCHEME |
20015168/01 |
Ghazipur |
Jakhania |
Parspur |
471555 |
Parspur |
Road Widening |
18-Mar-2026 |
|
The scheme was under operation and maintenance (O&M), and regular water supply was functioning smoothly up to 17-03-2026. However, on 18-03-2026, the HDPE pipeline of 63 mm diameter (78 Rmt) and 110 mm diameter (48 Rmt) was damaged by the PWD department during road construction work.As a result, 35 Nos. of FHTCs were damaged, along with 96 Rmt of MDPE pipeline. Due to this damage, we are currently unable to resume regular water supply. If the supply is started, water flows onto the road because of the damaged pipelines. |