1 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Cantt Nala |
Tapped Drains |
Flow of drain connected to 17.70 MLD STP Fatehgarh. |
15-Sep-2025 12:13 PM |
2 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Hathikhana Nala |
Tapped Drains |
Flow of drain connected to 17.70 MLD STP Fatehgarh. |
15-Sep-2025 12:14 PM |
3 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Amethi Kohna |
Tapped Drains |
Flow of drain connected to 30 MLD STP Farrukhabad. |
18-Aug-2025 10:46 AM |
4 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Bargadiya Ghat drain |
Tapped Drains |
Flow of drain connected to 17.70 MLD STP Fatehgarh. |
15-Sep-2025 12:14 PM |
5 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Bhairoghat drain |
Tapped Drains |
Flow of drain connected to 30 MLD STP Farrukhabad. |
15-Sep-2025 12:15 PM |
6 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Dheemarpur drain |
Tapped Drains |
Flow of drain connected to 30 MLD STP Farrukhabad. |
15-Sep-2025 12:16 PM |
7 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Pakkapul |
Tapped Drains |
Flow of drain connected to 30 MLD STP Farrukhabad. |
15-Sep-2025 12:16 PM |
8 |
Farrukhabad |
Farrukhabad-Fatehgarh |
I&D and STP works at Farrukhabad-Fatehgarh |
Tokaghat |
Tapped Drains |
Flow of drain connected to 30 MLD STP Farrukhabad. |
15-Sep-2025 12:16 PM |