| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20000701 | Name of Scheme: Bhudi Pakar WSS | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 3400 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Sep-2024 | Actual Date of Completion (Capex): 10-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24/108.95 | BUDHI PAKAR | 26.681229 | 83.733854 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 660/40 | BUDHI PAKAR | 26.681229 | 83.733854 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200/12 | BUDHI PAKAR | 26.681229 | 83.733854 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 125 | 0.011 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 7.588 | |
| 2 | HDPE PIPE | 75 | 0.427 | |
| 3 | HDPE PIPE | 90 | 1.303 | |
| 4 | HDPE PIPE | 110 | 0.311 | |
| 5 | HDPE PIPE | 125 | 1.194 | |
| 6 | HDPE PIPE | 140 | 0.380 | |
| 7 | HDPE PIPE | 200 | 0.633 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 611 |