Project Completion Certificate (Ground Water)
Scheme ID: 20009425 Name of Scheme: FATEHULLAGANJ WATER SUPPLY No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 3700 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-May-2023 Actual Date of Completion (Capex): 30-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24Mtr / 106M Fatehullah Ganj 28.7005083 78.64930667
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 48/46 Fatehullah Ganj 28.7005083 78.64930667
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 250KL / 13 M Fatehullah Ganj 28.7005083 78.64930667
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.221
2 HDPE Pipe PN-6: Class PE-100 75 0.307
3 HDPE Pipe PN-6: Class PE-100 63 4.191
4 HDPE Pipe PN-6: Class PE-100 110 0.214
5 HDPE Pipe PN-6: Class PE-100 140 1.131
6 HDPE Pipe PN-6: Class PE-100 160 0.232
7 HDPE Pipe PN-6: Class PE-100 200 0.059
HSC Connection
Sno. Total Nos.
Other Details
2.25
2.07
2.07
09-Sep-2025
25-Dec-2025