Project Completion Certificate (Ground Water)
Scheme ID: 20010919 Name of Scheme: RACHHOTI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 8559 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 25-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 46.98 Mtr / 82.63 Mtr RACHOTI 28.879592 77.86384
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1650 LPM / 56 Mtr RACHOTI 28.879592 77.86384
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 500 Kl / 18 M RACHOTI 28.879592 77.86384
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.04525
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 15.262
2 HDPE 90 0.763
3 HDPE 110 0.379
4 HDPE 125 0.356
5 HDPE 140 0.214
6 HDPE 180 0.104
7 HDPE 160 0.358
HSC Connection
Sno. Total Nos.
1 1180
Other Details
6.18
6.18
4.46
11-Aug-2023
07-Oct-2024