Project Completion Certificate (Ground Water)
Scheme ID: 20011011 Name of Scheme: Rudain Urf Manjhgawa No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2390 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Jun-2023 Actual Date of Completion (Capex): 25-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.08/102 Rudain Urf Majhgawan 26.59 83.45
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 33/43 Rudain Urf Majhgawan 26.59 83.45
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 150/16 Rudain Urf Majhgawan 26.59 83.45
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.03 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.87 Laying Completed
2 HDPE 75 0.52 Laying Completed
3 HDPE 90 0.7 Laying Completed
4 HDPE 140 0.33 Laying Completed
HSC Connection
Sno. Total Nos.
1 462
Other Details
1.76
0.00
2.02
21-Aug-2026
01-Sep-2026