Project Completion Certificate (Ground Water)
Scheme ID: 20011049 Name of Scheme: BHITANI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3800 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Feb-2023 Actual Date of Completion (Capex): 20-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 25.07/160.83 bHITANI 26.7889 83.2870
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 51/39 bHITANI 26.7889 83.2870
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200/12 bHITANI 26.7889 83.2870
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.012 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.498 Laying Completed
2 HDPE 75 1.929 Laying Completed
3 HDPE 90 0.944 Laying Completed
4 HDPE 110 0.359 Laying Completed
5 HDPE 140 0.288 Laying Completed
6 HDPE 200 0.136 Laying Completed
HSC Connection
Sno. Total Nos.
1 450
Other Details
2.17
0.00
2.16
24-Dec-2024
01-Apr-2026