Project Completion Certificate (Ground Water)
Scheme ID: 20011085 Name of Scheme: kundesra village water supply scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 7302 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Sep-2023 Actual Date of Completion (Capex): 10-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 54.26 MTR / 96.38 MTR KUNDESRA (M.S.T) SAKLI 29.142827 78.736705
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 950 LPM / 40 MTR KUNDESRA (M.S.T) SAKLI 29.142827 78.736705
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300 KL / 16 MTR KUNDESRA (M.S.T) SAKLI 29.143034 78.736944
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.025 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.422 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 1.200 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 8.000 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.622 OK
5 HDPE PIPE PN-6: CLASS PE-100 125 0.200 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.400 OK
HSC Connection
Sno. Total Nos.
1 650
Other Details
3.02
0.00
2.88
11-Mar-2025
12-Mar-2025