Project Completion Certificate (Ground Water)
Scheme ID: 20011095 Name of Scheme: Rustampur Khas Village water supply scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 27-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.45MTR/101.61MTR RUSTAMPUR KHAS 29.595175 78.83548
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 700LPM/47MTR RUSTAMPUR KHAS 29.595175 78.83548
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175KL/14MTR RUSTAMPUR KHAS 29.595149 78.83545
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.014 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 2.132 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.274 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 6.328 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 1.495 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.242 OK
6 HDPE PIPE PN-6: CLASS PE-100 200 0.134 OK
HSC Connection
Sno. Total Nos.
1 579
Other Details
2.32
2.30
2.32
25-Jun-2024
26-Jun-2024