Project Completion Certificate (Ground Water)
Scheme ID: 20011477 Name of Scheme: Alavas Batari WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1761 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Jun-2023 Actual Date of Completion (Capex): 30-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18/63.69 Alavas Batari 28.635839 77.978383
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 375/42 Alavas Batari 28.635813 77.978388
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100KL/12M Alavas Batari 28.635724 77.978315
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 .00625
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 160 .022
2 HDPE 140 .48920
3 HDPE 110 .541
4 HDPE 90 .120
5 HDPE 75 .025
6 HDPE 63 3.94730
HSC Connection
Sno. Total Nos.
1 332
Other Details
1.52
1.52
1.52
30-Jul-2025
04-Jul-2025