| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20012428 | Name of Scheme: Junedpur | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2200 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 17-Jul-2023 | Actual Date of Completion (Capex): 01-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24 M / 93.75 M | Junedpur | 28.432715 | 77.727973 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 500 LPM / 50.60 M | Junedpur | 28.432715 | 77.727973 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150 KL / 16 M | Junedpur | 28.432847 | 77.727759 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.0068 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.01 | |
| 2 | HDPE | 75 | 1.069 | |
| 3 | HDPE | 90 | 0.181 | |
| 4 | HDPE | 110 | 0.409 | |
| 5 | HDPE | 140 | 0.267 | |
| 6 | HDPE | 160 | 0.18 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 361 |