Project Completion Certificate (Ground Water)
Scheme ID: 20012848 Name of Scheme: SHEKHPUR BHAWRA WATER SUPPLY SCHEME No. of Villages: 0 No. of Habitation Covered: 0
Total Population Covered: 2096 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 12-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 12.04 MTR /126.08 MTR SHEKHPUR BHAWARA 29.337690 78.504433
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 7.50 HP 350 LMP /44 MTR SHEKHPUR BHAWARA 29.337690 78.504433
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-01 100 KL/14 MTR SHEKHPUR BHAWARA 29.337659 78.504139
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.012
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-06 PE -100 CLASS 110 0.082
2 HDPE PIPE PN-06 PE -100 CLASS 90 0.369
3 HDPE PIPE PN-06 PE -100 CLASS 75 1.300
4 HDPE PIPE PN-06 PE -100 CLASS 63 4.284
HSC Connection
Sno. Total Nos.
1 324
Other Details
1.36
1.34
1.36
10-Jun-2024
11-Jun-2024