Project Completion Certificate (Ground Water)
Scheme ID: 20013910 Name of Scheme: Khadana village water supply scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 6880 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2023 Actual Date of Completion (Capex): 05-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 0.31MTR/101MTR KHADANA 28.864397 78.700714
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 400LPM/45MTR KHADANA 28.864397 78.700714
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150KL/12MTR KHADANA 28.854259 78.7006
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.012 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.203 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.134 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 7.764 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.170 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.579 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.080 OK
7 HDPE PIPE PN-6: CLASS PE-100 200 0.030 OK
HSC Connection
Sno. Total Nos.
1 670
Other Details
1.98
1.90
1.98
03-Nov-2024
04-Nov-2024