| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014146 | Name of Scheme: Muradpur Nibiakhera | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3308 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 31-Aug-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 27.07/89.29 | MURADPUR NIBIAKHERA | 28.259706 | 80.255960 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 40.68 M3/43 M | MURADPUR NIBIAKHERA | 28.259706 | 80.255960 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 200 KL/12 M | MURADPUR NIBIAKHERA | 28.259600 | 80.256026 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.02975 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE /6Kg | 63 | 4.478 | |
| 2 | HDPE /6Kg | 75 | 0.367 | |
| 3 | HDPE /6Kg | 90 | 0.509 | |
| 4 | HDPE /6Kg | 110 | 0.144 | |
| 5 | HDPE /6Kg | 140 | 0.133 | |
| 6 | HDPE /6Kg | 160 | 0.012 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 615 |