| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014312 | Name of Scheme: Raib Nagla village water supply scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1840 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-Feb-2024 | Actual Date of Completion (Capex): 18-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 2.19 MTR / 101.45 MTR | RAIB NAGLA | 28.679872 | 78.76618 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBEMERSIBLE PUMP | 100 LPM / 45 MTR | RAIB NAGLA | 28.679872 | 78.76618 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 50 KL / 12 MTR | RAIB NAGLA | 28.679884 | 78.766173 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 80 | 0.012 | OK |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6: CLASS PE-100 | 90 | 0.138 | OK |
| 2 | HDPE PIPE PN-6: CLASS PE-100 | 75 | 0.303 | OK |
| 3 | HDPE PIPE PN-6: CLASS PE-100 | 63 | 1.941 | OK |
| 4 | HDPE PIPE PN-6: CLASS PE-100 | 110 | 0.045 | OK |
| 5 | HDPE PIPE PN-6: CLASS PE-100 | 140 | 0.0118 | OK |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 207 |