Project Completion Certificate (Ground Water)
Scheme ID: 20014507 Name of Scheme: SABALPUR PWS No. of Villages: 5 No. of Habitation Covered: 5
Total Population Covered: 3225 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 22-Nov-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 20 Mtr. / 90.52 Mtr. Sabalpur 26.710739 79.62218
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 62.6 (M3/Hr.) / 47 Mtr. Sabalpur 26.710739 79.62218
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200 Kl/ 16 (Mtr.) Sabalpur 26.623118 79.55056
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 .005
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.867
2 HDPE 75 0.458
3 HDPE 90 0.01
4 HDPE 110 0.093
5 HDPE 140 3.485
6 HDPE 160 1.338
7 HDPE 180 0.022
HSC Connection
Sno. Total Nos.
1 340
Other Details
2.19
2.35
2.35
09-Mar-2025
10-Mar-2025