| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20014507 | Name of Scheme: SABALPUR PWS | No. of Villages: 5 | No. of Habitation Covered: 5 |
| Total Population Covered: 3225 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 08-May-2023 | Actual Date of Completion (Capex): 22-Nov-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 20 Mtr. / 90.52 Mtr. | Sabalpur | 26.710739 | 79.62218 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 62.6 (M3/Hr.) / 47 Mtr. | Sabalpur | 26.710739 | 79.62218 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 200 Kl/ 16 (Mtr.) | Sabalpur | 26.623118 | 79.55056 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | .005 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.867 | |
| 2 | HDPE | 75 | 0.458 | |
| 3 | HDPE | 90 | 0.01 | |
| 4 | HDPE | 110 | 0.093 | |
| 5 | HDPE | 140 | 3.485 | |
| 6 | HDPE | 160 | 1.338 | |
| 7 | HDPE | 180 | 0.022 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 340 |