Project Completion Certificate (Ground Water)
Scheme ID: 20014800 Name of Scheme: Bilhari No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2273 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Jul-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.05/62.38 BILHARI 27.933840 79.770836
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 28.80.43 BILHARI 27.933840 79.770836
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/12 BILHARI 27.933858 79.771019
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 3.993
2 HDPE / 6KG 75 0.085
3 HDPE / 6KG 90 0.189
4 HDPE / 6KG 110 0.304
5 HDPE / 6KG 160 0.099
HSC Connection
Sno. Total Nos.
1 290
Other Details
1.85
0.00
1.85
30-Oct-2023
06-Dec-2024