Project Completion Certificate (Ground Water)
Scheme ID: 20015131 Name of Scheme: HARDUA Powayan W/s No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2310 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 31-Aug-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.07/96.29 HARDUA 28.101513 80.028516
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 29.88M3/45M HARDUA 28.101513 80.028516
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150KL-16M HARDUA 28.101579 80.028568
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 4.442
2 HDPE/6KG 75 1.078
3 HDPE/6KG 90 1.170
4 HDPE/6KG 110 0.974
5 HDPE/6KG 140 0.250
6 HDPE/6KG 160 0.021
HSC Connection
Sno. Total Nos.
1 560
Other Details
2.01
0.00
1.94
30-Nov-2023
06-Dec-2023