Project Completion Certificate (Ground Water)
Scheme ID: 20015142 Name of Scheme: JEWAN W/s No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4597 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.07/96.34 JEWAN 28.069281 80.154980
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 54.77/45 JEWAN 28.069281 80.154980
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 250/16 JEWAN 28.069388 80.154862
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 7.926
2 HDPE/6KG 75 0.952
3 HDPE/6KG 90 0.919
4 HDPE/6KG 110 0.655
5 HDPE/6KG 140 0.265
6 HDPE/6KG 160 0.026
HSC Connection
Sno. Total Nos.
1 1011
Other Details
3.08
0.00
3.04
14-Mar-2024
06-Dec-2024