Project Completion Certificate (Ground Water)
Scheme ID: 20015181 Name of Scheme: Shekhoopur Khas village water supply scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4640 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Feb-2023 Actual Date of Completion (Capex): 15-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 48.10 MTR / 80.23 MTR SHEKHOOPUR KHAS 28.668344 78.749513
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBEMERSIBLE PUMP 650 LPM / 45 MTR SHEKHOOPUR KHAS 28.668344 78.749513
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL / 12 MTR SHEKHOOPUR KHAS 28.668196 78.749692
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.0447 OK
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 90 0.111 OK
2 HDPE PIPE PN-6: CLASS PE-100 75 0.319 OK
3 HDPE PIPE PN-6: CLASS PE-100 63 4.525 OK
4 HDPE PIPE PN-6: CLASS PE-100 110 0.180 OK
5 HDPE PIPE PN-6: CLASS PE-100 140 0.079 OK
6 HDPE PIPE PN-6: CLASS PE-100 160 0.115 OK
7 HDPE PIPE PN-6: CLASS PE-100 200 0.065 OK
HSC Connection
Sno. Total Nos.
1 455
Other Details
1.72
0.00
1.72
15-Dec-2024
01-Jan-2025