Project Completion Certificate (Ground Water)
Scheme ID: 20015597 Name of Scheme: Bikrampur No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3240 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 24-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20.01/88.15 Bikrampur 27.679184 79.394004
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT - PUMP 40.32/45 Bikrampur 27.679184 79.394004
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200/16 Bikrampur 27.678759 79.393776
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE /6KG 63 5.863
2 HDPE /6KG 75 0.382
3 HDPE /6KG 90 0.767
4 HDPE /6KG 110 0.390
5 HDPE /6KG 140 0.157
HSC Connection
Sno. Total Nos.
Other Details
2.33
0.00
2.33
23-Oct-2024
06-Dec-2024