Project Completion Certificate (Ground Water)
Scheme ID: 20015851 Name of Scheme: Khiriya pathak No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1870 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Sep-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.02/84.15 KHIRIYA PATHAK 28.017502 80.071221
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP -1 25.2M3/43M KHIRIYA PATHAK 28.017502 80.071221
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 125 KL - 12 M KHIRIYA PATHAK 28.017502 80.071221
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 3.172
2 HDPE/6KG 75 0.221
3 HDPE/6KG 110 0.537
4 HDPE/6KG 140 0.446
HSC Connection
Sno. Total Nos.
1 345
Other Details
1.57
0.00
1.57
30-Dec-2023
06-Dec-2024