| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20015915 | Name of Scheme: Fatehpur Salawatnagar village water supply scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2440 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 09-Feb-2023 | Actual Date of Completion (Capex): 05-Aug-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 8.41 MTR / 101.90 MTR | FATEHPUR SALAWATNAGAR | 28.650238 | 78.707638 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBEMERSIBLE PUMP | 350 LPM / 45 MTR | FATEHPUR SALAWATNAGAR | 28.650238 | 78.707638 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 100 KL / 14 MTR | FATEHPUR SALAWATNAGAR | 28.652548 | 78.703381 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 DI PIPE | 100 | 0.020 | OK |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6: CLASS PE-100 | 90 | 0.140 | OK |
| 2 | HDPE PIPE PN-6: CLASS PE-100 | 75 | 0.145 | OK |
| 3 | HDPE PIPE PN-6: CLASS PE-100 | 63 | 2.473 | OK |
| 4 | HDPE PIPE PN-6: CLASS PE-100 | 110 | 0.121 | OK |
| 5 | HDPE PIPE PN-6: CLASS PE-100 | 140 | 0.100 | OK |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 239 |