Project Completion Certificate (Ground Water)
Scheme ID: 20015924 Name of Scheme: KURKAWALI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-May-2023 Actual Date of Completion (Capex): 09-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 27Mtr / 133M Kurkawali 28.635448 78.517331
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 48/48 Kurkawali 28.635448 78.517331
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 250/16 Kurkawali 28.635448 78.517331
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 35
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.975
2 HDPE Pipe PN-6: Class PE-100 75 0.806
3 HDPE Pipe PN-6: Class PE-100 63 5.261
4 HDPE Pipe PN-6: Class PE-100 110 0.536
5 HDPE Pipe PN-6: Class PE-100 140 0.402
6 HDPE Pipe PN-6: Class PE-100 160 1.391
7 HDPE Pipe PN-6: Class PE-100 200 0.234
HSC Connection
Sno. Total Nos.
1 561
Other Details
2.65
2.29
2.29
05-Sep-2024
20-Dec-2025