Project Completion Certificate (Ground Water)
Scheme ID: 20016361 Name of Scheme: NAGLA KHOKAR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1710 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Nov-2023 Actual Date of Completion (Capex): 14-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15.05 Mtr/ 90.81 Mtr Nangla Khokhar 28.31'3591'' 78.38'3596''
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5 HP Submersible Pump 21.6 cum / 44 M Nangla Khokhar 28.31'3591'' 78.38'3596''
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 100 KL/ 12 M Nangla Khokhar 28.31'3591'' 78.38'3596''
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K7 100 0.031
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 3.941
2 HDPE Pipe PN-6: Class PE-100 75 0.336
3 HDPE Pipe PN-6: Class PE-100 90 0.344
4 HDPE Pipe PN-6: Class PE-100 110 0.094
5 HDPE Pipe PN-6: Class PE-100 140 0.160
HSC Connection
Sno. Total Nos.
1 227
Other Details
1.41
1.27
1.27
15-Dec-2025
01-Jan-2026