Project Completion Certificate (Ground Water)
Scheme ID: 20016550 Name of Scheme: babauri No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2810 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 24-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21.03/94.47 BABAURI 27.927957 80.019355
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 35.64/43 BABAURI 27.927957 80.019355
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 175/12 BABAURI 27.927951 80.019350
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.345
2 HDPE / 6KG 75 0.250
3 HDPE / 6KG 90 0.040
4 HDPE / 6KG 110 2.260
5 HDPE / 6KG 140 0.045
6 HDPE / 6KG 160 0.019
HSC Connection
Sno. Total Nos.
1 529
Other Details
2.19
0.00
2.19
24-Mar-2024
06-Dec-2024