Project Completion Certificate (Ground Water)
Scheme ID: 20016956 Name of Scheme: ALLEHYARPUR WATER SUPPLY SCHEME No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 6300 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2024 Actual Date of Completion (Capex): 12-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15.00 MTR / 135.00 MTR ALLEHYARPUR 29.503192 78.366418
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 15.0 HP 825 LPM / 44 MTR ALLEHYARPUR 29.503192 78.366418
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 16 MTR ALLEHYARPUE 29.503192 78.366418
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.036
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-06 PE-100 180 0.017
2 HDPE PIPE PN-06 PE-100 160 2.173
3 HDPE PIPE PN-06 PE-100 140 1.418
4 HDPE PIPE PN-06 PE-100 125 3.014
5 HDPE PIPE PN-06 PE-100 110 0.026
6 HDPE PIPE PN-06 PE-100 90 0.063
7 HDPE PIPE PN-06 PE-100 75 0.141
8 HDPE PIPE PN-06 PE-100 63 8.539
HSC Connection
Sno. Total Nos.
1 692
Other Details
2.97
2.97
2.97
12-Mar-2025
13-Mar-2025