Project Completion Certificate (Ground Water)
Scheme ID: 20017120 Name of Scheme: Siwara khas W/S Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2268 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Aug-2022 Actual Date of Completion (Capex): 28-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150x200 MM TUBE WELL 21/121.31 SIWARA KHAS 27.665708 79.170378
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 600/42.5 SIWARA KHAS 27.665708 79.170378
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL 16 M SIWARA KHAS 27.665708 79.170378
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 0.01947 SIWARA KHAS
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8185
2 HDPE 75 69.2
3 HDPE 90 692.8
4 HDPE 110 324.4
5 HDPE 140 1737
6 HDPE 160 503
HSC Connection
Sno. Total Nos.
1 415
Other Details
32744611.60
29828040.00
29278881.95
27-Oct-2025
28-Oct-2025