| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018036 | Name of Scheme: Padria dalelpur | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 3620 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 31-Jul-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 22.36/96.14 | PADARIA DALELPUR | 28.209351 | 80.130974 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 44.46/45 | PADARIA DALELPUR | 28.209351 | 80.130974 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 200/18 | PADARIA DALELPUR | 28.209358 | 80.130835 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6Kg | 63 | 9.590 | |
| 2 | HDPE/6Kg | 75 | 2.265 | |
| 3 | HDPE/6Kg | 90 | 0.859 | |
| 4 | HDPE/6Kg | 110 | 0.624 | |
| 5 | HDPE/6Kg | 140 | 0.170 | |
| 6 | HDPE/6Kg | 180 | 0.023 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 662 |