Project Completion Certificate (Ground Water)
Scheme ID: 20018243 Name of Scheme: Yusufpur Hamid Water supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1961 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 29-Oct-2021 Actual Date of Completion (Capex): 07-May-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.03
2 K-7 DI PIPE 150 0.01
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 4.80
2 HDPE PIPE PN -6: CLASS PE -100 75 0.11
3 HDPE PIPE PN -6: CLASS PE -100 90 0.10
4 HDPE PIPE PN -6: CLASS PE -100 125 0.01
HSC Connection
Sno. Total Nos.
Other Details
1.58
1.58
1.58
08-Aug-2024
09-Aug-2024