Project Completion Certificate (Ground Water)
Scheme ID: 20018249 Name of Scheme: Mohammadpur Sultan Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1630 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Feb-2022 Actual Date of Completion (Capex): 31-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WEELL 18m/120.31m Mohammadpur Sultan 29.341854 78.496462
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 10 HP 450 lpm /42m Mohammadpur Sultan 29.341854 78.496462
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125kl/12M Mohammadpur Sultan 29.341854 78.496462
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: CLASS PE-100 63 2.30
2 HDPE PIPE PN-6: CLASS PE-100 75 0.30
3 HDPE PIPE PN-6: CLASS PE-100 90 0.17
4 HDPE PIPE PN-6: CLASS PE-100 110 0.03
5 HDPE PIPE PN-6: CLASS PE-100 125 0.2
6 HDPE PIPE PN-6: CLASS PE-100 140 0.06
HSC Connection
Sno. Total Nos.
1 325
Other Details
1.49
1.49
1.41
31-Oct-2025
01-Nov-2025