| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018255 | Name of Scheme: MAKRAIDA PWS SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3024 | Base Year: 2022 | Intermediate Year: 2033 | Design Year: 2055 |
| Date of Completion (As per Contract): 09-Feb-2022 | Actual Date of Completion (Capex): 01-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 21/60 | makreda | 28.772937 | 77.42878 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | pump | 400/55 | makreda | 28.772937 | 77.42878 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/16 | makreda | 28.772937 | 77.42878 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.509 | |
| 2 | HDPE | 75 | 0.411 | |
| 3 | HDPE | 90 | 0.661 | |
| 4 | HDPE | 110 | 0.856 | |
| 5 | HDPE | 140 | 0.193 | |
| 6 | HDPE | 160 | 0.240 | |
| 7 | HDPE | 200 | 0.140 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 351 |