Project Completion Certificate (Ground Water)
Scheme ID: 20018926 Name of Scheme: NAGLIYA BALLU WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 3540 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-May-2023 Actual Date of Completion (Capex): 30-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/106 Nagaliya Ballu 28.48792667 78.65569
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 15 HP Submersible Pump 0.75/45 Nagaliya Ballu 28.48792667 78.65569
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Conventional OHT 250/11 Nagaliya Ballu 28.48792667 78.65569
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe 150 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.614
2 HDPE Pipe PN-6: Class PE-100 75 0.911
3 HDPE Pipe PN-6: Class PE-100 63 5.996
4 HDPE Pipe PN-6: Class PE-100 110 0.196
5 HDPE Pipe PN-6: Class PE-100 140 0.106
6 HDPE Pipe PN-6: Class PE-100 160 0.732
7 HDPE Pipe PN-6: Class PE-100 200 0.042
HSC Connection
Sno. Total Nos.
1 620
Other Details
2.43
2.32
2.32
01-Oct-2025
01-Jan-2026