Project Completion Certificate (Ground Water)
Scheme ID: 20019703 Name of Scheme: Garopur No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 3290 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 27-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24.25 /73.23 GAROPUR 26º 11' 59.487" N 82º 47' 11.99" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 33/43 GAROPUR 26º 11' 59.487" N 82º 47' 11.99" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 150/12 GAROPUR 26º 11' 59.487" N 82º 47' 11.99" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 7.4882
2 HDPE Pipe PN-6: Class PE-100 75 2.891
3 HDPE Pipe PN-6: Class PE-100 90 0.346
4 HDPE Pipe PN-6: Class PE-100 110 0.828
5 HDPE Pipe PN-6: Class PE-100 140 0.746
6 HDPE Pipe PN-6: Class PE-100 160 0.563
HSC Connection
Sno. Total Nos.
1 350
Other Details
2.17
0.00
2.16
18-Jan-2026
29-Jan-2026