| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020086 | Name of Scheme: Bishambhara | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 1871 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2021 |
| Date of Completion (As per Contract): 22-May-2022 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 9/59.08 | Bishambhara | 25.794911 | 82.735635 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 450/46.6 | Bishambhara | 25.794911 | 82.735635 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150/12 | Bishambhara | 25.79475 | 82.735568 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-9 | 150 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN -6 | 63 | 6.920 | |
| 2 | HDPE PN -6 | 75 | 0.525 | |
| 3 | HDPE PN -6 | 90 | 1.304 | |
| 4 | HDPE PN -6 | 110 | 1.631 | |
| 5 | HDPE PN -6 | 140 | 0.711 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 293 |