Project Completion Certificate (Ground Water)
Scheme ID: 20020800 Name of Scheme: GURTHNA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2590 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.03/94.68 GURTHNA 27.784555 79789939
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 31.80 M3 / 45 M GURTHNA 27.784555 79789939
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150 KL-16 M GURTHNA 27.784698 79.789696
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6Kg 63 4.985
2 HDPE / 6Kg 75 0.489
3 HDPE / 6Kg 90 0.246
4 HDPE / 6Kg 110 3.103
5 HDPE / 6Kg 140 0.160
HSC Connection
Sno. Total Nos.
1 463
Other Details
2.08
0.00
2.08
29-Feb-2024
06-Dec-2024