| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020896 | Name of Scheme: Prempur | No. of Villages: 2 | No. of Habitation Covered: 6 |
| Total Population Covered: 3490 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2021 |
| Date of Completion (As per Contract): 22-May-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12.09/99.93 | Premapur | 25.773288 | 82.742996 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 800/49.3 | Premapur | 25.773288 | 82.742996 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225/14 | Premapur | 25.773351 | 82.742996 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-9 | 150 | 0.3 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 11.235 | |
| 2 | HDPE PN-6 | 75 | 2.633 | |
| 3 | HDPE PN-6 | 90 | .801 | |
| 4 | HDPE PN-6 | 110 | 1.247 | |
| 5 | HDPE PN-6 | 140 | 1.113 | |
| 6 | HDPE PN-6 | 200 | .683 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 555 |