| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20020921 | Name of Scheme: Haripur | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 3517 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 22-May-2023 | Actual Date of Completion (Capex): 12-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X200 | 36.14/149.42 | Haripur | 25.553293 | 82.508778 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-17.5HP | 800/52.80 | Haripur | 25.553293 | 82.508778 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225/18 | Haripur | 25.553254 | 82.508595 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 150 | 0.015 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 200 | 0.045 | |
| 2 | HDPE PIPE PN-6 | 160 | 0.168 | |
| 3 | HDPE PIPE PN-6 | 140 | 0.847 | |
| 4 | HDPE PIPE PN-6 | 110 | 2.467 | |
| 5 | HDPE PIPE PN-6 | 90 | 1.860 | |
| 6 | HDPE PIPE PN-6 | 75 | 1.610 | |
| 7 | HDPE PIPE PN-6 | 63 | 13.505 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 398 |