Project Completion Certificate (Ground Water)
Scheme ID: 20022478 Name of Scheme: Agauta No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4835 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Feb-2025 Actual Date of Completion (Capex): 01-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 36M / 92.73M Agota 28.541537 77.880275
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 980 LPM / 49 M Agota 28.541537 77.880275
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 300Kl / 12M Agota 28.541537 77.880275
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.0167
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 12.91
2 HDPE 75 0.622
3 HDPE 90 0.789
4 HDPE 110 0.294
5 HDPE 125 0.211
6 HDPE 160 0.164
7 HDPE 180 0.078
8 HDPE 200 0.196
HSC Connection
Sno. Total Nos.
1 991
Other Details
2.95
2.85
2.88
15-Oct-2025
16-Oct-2025