| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022478 | Name of Scheme: Agauta | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 4835 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 24-Feb-2025 | Actual Date of Completion (Capex): 01-Jul-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 36M / 92.73M | Agota | 28.541537 | 77.880275 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 980 LPM / 49 M | Agota | 28.541537 | 77.880275 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 300Kl / 12M | Agota | 28.541537 | 77.880275 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.0167 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 12.91 | |
| 2 | HDPE | 75 | 0.622 | |
| 3 | HDPE | 90 | 0.789 | |
| 4 | HDPE | 110 | 0.294 | |
| 5 | HDPE | 125 | 0.211 | |
| 6 | HDPE | 160 | 0.164 | |
| 7 | HDPE | 180 | 0.078 | |
| 8 | HDPE | 200 | 0.196 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 991 |