| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20022506 | Name of Scheme: RAJPURA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 5817 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 12-Feb-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 50.86 Mtr / 81.83 Mtr | RAJPURA | 29.005603 | 77.768372 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 1250 LPM / 54 Mtr | RAJPURA | 29.005603 | 77.768372 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 350 Kl / 16 M | RAJPURA | 29.005603 | 77.768372 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 200 | 0.0032 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.205 | |
| 2 | HDPE | 90 | 0.388 | |
| 3 | HDPE | 110 | 0.534 | |
| 4 | HDPE | 125 | 0.602 | |
| 5 | HDPE | 140 | 0.623 | |
| 6 | HDPE | 160 | 0.252 | |
| 7 | HDPE | 180 | 0.208 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1043 |