Scheme ID: 20022725 Name of Scheme: Dharmangadpur No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 2900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-May-2023 Actual Date of Completion (Capex): 21-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 11.05 Mtr./ 40.52 Mtr. Dharmangadpur 26.861838 79.595316
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 36 (M3/ Hr.)/ 46 Mtr. Dharmangadpur 26.861838 79.595316
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 Kl/ 16 Mtr. Dharmangadpur 26.861776 79.595333
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 150 0.0135
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.015
2 HDPE 75 1.418
3 HDPE 90 0.19
4 HDPE 110 0.975
5 HDPE 140 0.993
6 HDPE 160 0.137
HSC Connection
Sno. Total Nos.
1 327
Other Details
1.84
1.84
1.86
09-Nov-2024
10-Nov-2024