Project Completion Certificate (Ground Water)
Scheme ID: 20023769 Name of Scheme: Ghatoli No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2016 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Mar-2025 Actual Date of Completion (Capex): 31-Dec-2027
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/115.20 GHATOLI 28.922271 77.432804
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 450LPM/62M GHATOLI 28.922271 77.432804
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150KL/12M GHATOLI 28.922308 77.432595
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K7 100 0.0381
2 K7 200 0.0063
3 K7 150 0.0090
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.2741
2 HDPE 75 1.6327
3 HDPE 63 2.5352
4 HDPE 160 0.2248
5 HDPE 140 0.3018
6 HDPE 125 0.1789
HSC Connection
Sno. Total Nos.
1 552
Other Details
1.59
1.59
1.71
10-Mar-2026
11-Mar-2026