| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20023896 | Name of Scheme: SHAHZADPUR | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 3030 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 04-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 24/103.28 | SHAHZADPUR | 27.934853 | 80.035412 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP -1 | 39.60 M3/45M | SHAHZADPUR | 27.934853 | 80.035412 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200 KL - 16 M | SHAHZADPUR | 27.931245 | 80.038547 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6KG | 63 | 5.753 | |
| 2 | HDPE / 6KG | 75 | 1.378 | |
| 3 | HDPE / 6KG | 90 | 0.745 | |
| 4 | HDPE / 6KG | 110 | 1.725 | |
| 5 | HDPE / 6KG | 160 | 2.433 | |
| 6 | HDPE / 6KG | 180 | .063 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 730 |