Project Completion Certificate (Ground Water)
Scheme ID: 20024330 Name of Scheme: Rampur Bishna Gram Panchayat Water Supply No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2631 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24 / 156.02 Rampur Bishna 29.482134 78.236393
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 600 / 55 Rampur Bishna 29.482134 29.482134
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 / 12 Rampur Bishna 29.482134 29.482134
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.076
2 HDPE 75 0.265
3 HDPE 90 0.237
4 HDPE 110 1.221
5 HDPE 140 0.279
HSC Connection
Sno. Total Nos.
1 439
Other Details
2.08
0.00
2.08
10-Aug-2025
11-Aug-2025