Project Completion Certificate (Ground Water)
Scheme ID: 20024522 Name of Scheme: BHIDASIN GRAMIN PEYJAL YOJNA No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2030 Base Year: 2022 Intermediate Year: 2037 Design Year: 2025
Date of Completion (As per Contract): 06-Jan-2024 Actual Date of Completion (Capex): 15-Jul-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Plain Pipe- 200mm Dia 54.21 Bhidasin 26.990226 79.870367
2 Plain Pipe- 150mm Dia 52.12 Bhidasin 26.990226 79.870367
3 Slotted Pipe- 200mm Dia 6.00 Bhidasin 26.990226 79.870367
4 Slotted Pipe- 150mm Dia 11.00 Bhidasin 26.990226 79.870367
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 449/67 Bhidasin 26.990226 79.870367
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zn-Al Structure 125/16 Bhidasin 26.990226 79.870367
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Rising main/DI Pipe 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 Distribution Pipe/HDPE 63 3.259
2 Distribution Pipe/HDPE 75 0.281
3 Distribution Pipe/HDPE 90 0.277
4 Distribution Pipe/HDPE 110 0.720
5 Distribution Pipe/HDPE 160 0.503
6 Distribution Pipe/HDPE 180 0.501
HSC Connection
Sno. Total Nos.
1 377
Other Details
1.88
1.98
0.00
16-Nov-2025
17-Nov-2025