Project Completion Certificate (Ground Water)
Scheme ID: 20024959 Name of Scheme: Aurangabad Wss No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2420 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 14-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.06/90.10 AURANGABAD 28.074814 80.233495
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 48.6M3/43M AURANGABAD 28.074814 80.233495
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 225KL-12M AURANGABAD 28.074835 80.233480
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 150 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 7.430
2 HDPE/6KG 75 0.680
3 HDPE/6KG 90 0.750
4 HDPE/6KG 110 0.663
5 HDPE/6KG 140 0.005
6 HDPE/6KG 160 0.012
7 HDPE/6KG 180 0.829
HSC Connection
Sno. Total Nos.
1 648
Other Details
2.22
0.00
2.22
14-Mar-2024
06-Dec-2024