Project Completion Certificate (Ground Water)
Scheme ID: 20024971 Name of Scheme: Barhana WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3648 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 17-Mar-2024 Actual Date of Completion (Capex): 12-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 24.12/68.70 Barhana 28.587139 78.137211
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 675/45 Barhana 28.587246 78.137236
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200KL/12M Barhana 28.587236 78.137284
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.00675
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 140 .37990
2 HDPE 110 .05880
3 HDPE 90 .22650
4 HDPE 75 .34780
5 HDPE 63 8.846
HSC Connection
Sno. Total Nos.
1 757
Other Details
2.19
2.15
2.15
12-Aug-2025
13-Aug-2025